Public Utility District No.1 of Ferry County
Schedule 400
Large Power Service
Availability:
Available for commercial, industrial and other lighting and power uses having
an established measured demand of 50 KW or more. Application requirements,
once established, may be waived only by action of the Board of Commissioners of
the District. Subject to the District's established rules and regulations.
Type of Service:
Sixty-cycle, alternating current, single phase or multi-phase at available
primary or secondary voltages. Metered for demand and energy.
Monthly Rate:
| Basic Charge: |
Demand minimum billing |
|
|
| Energy Charge: |
$0.05841 per KWH |
|
|
| Demand Charge: |
$250.00 per month for the |
|
first 50 KW. |
| |
$4.07/KW for each add'l KW up |
|
to 105% of peak Demand $9.62/KW |
|
over 105% of peak Demand |
|
|
|
|
| Minimum Charge: |
Demand minimum billing |
|
plus any extension policy |
|
requirements |
Minimum Annual Charge for Seasonal Service:
Consumers requiring service only during certain seasons may guarantee a
minimum annual charge, in which case there will be no minimum monthly
charge. The minimum annual charge shall be sufficient to assure
adequate compensation for the facilities installed to serve the
consumer. In no event shall it be less than twelve times the minimum
monthly demand charge.
Determination of Billing Demand:
The billing demand shall be the maximum average kilowatt load used by the
consumer for any period of thirty (30) consecutive minutes during the month for
which the bill is rendered as indicated or recorded by a demand meter.
Wholesale Power Cost Adjustment:
The energy charge component of this rate schedule may be increased to cover
any wholesale power cost adjustment levied against the District by it's power
supplier.
Back to top
Return to Rates
|