Public Utility District No.1 of Ferry County
Schedule 300
Irrigation Service
Availability:
Available for service to irrigation pumps, subject to the District's
established rules and regulations.
Type of Service:
Three phase, 60 cycle, at available secondary voltages. At the
discretion of the District, single phase service may be furnished provided the
motor capacity is not in excess of 10 H.P.
Monthly Rate:
$12.00 per connected horsepower
All energy - $0.04745 per KWH
Determination of Horsepower:
The District shall determine the connected horsepower by nameplate rating of
the motor or at it's option by test under conditions or maximum operating load.
Minimum Annual Charge:
The minimum annual charge shall be $12.00 per horsepower. Provided,
however, that for three-phase service, the minimum annual charge shall not be
less than $120.00, and for single-phase service, the minimum annual charge shall
not be less than $60.00. Non Usage Discount: Irrigation
installations, not under construction contract, which are idle for the full
pumping season will receive a discount of twenty-five percent (25%) of the
annual horsepower charge provided that such discount will not reduce the annual
billing to less than the Minimum Annual Charge for single or three phase
service. This discount will be allowed only after the completion of the
pumping season.
Pumping Season:
April 20th through October 20th. Service may be provided off season at
the District's residential/seasonal energy rate. Power Factor Adjustment: The consumer shall maintain
unity power factor as nearly as practicable. Horsepower, for billing
purposes, may be adjusted for consumers with 50 H.P. or more to correct for
average power factor lower than 97%, and may be so adjusted for other consumers
if and when the District deems necessary. Such adjustments will be made by
increasing the horsepower 1% for each 1% by which the average power factor is
less than 97%. Wholesale Power Cost Adjustment: The energy
charge component of this rate schedule may be increased to cover any wholesale
power cost adjustment levied against the District by its power supplier. Back
to top Return to Rates |